ExMC
*Updated 170918
*Zip file containing meeting documents and linked agenda ExMC/1260C/DA (17MB)
(extract to a folder, then open Agenda ExMC/1260C/DA which contains hypertext links to the documents referenced in the agenda)
-
Agenda ItemDocument NumberTitle
-
2.0
Revised Draft Agenda - The Nineteenth Meeting of the ExMC. To be held in Washington, USA on 28th and 29th September 2017.
-
3.1, 3.2.1
The Eighteenth Meeting of the ExMC Umhlanga, South Africa8th and 9th September 2016 Confirmed Formal Minutes
-
4.1
US Proposals to discuss Clause 6 of ExMC/1144A/DV – Audit of the Assessment process for the acceptance of applicant ExCBs and ExTLs and maintenance of existing ExCBs and ExTLs.
-
4.1
IECEx Assessment Procedures Revision of OD 003-2 - Procedures for IECEx acceptance of Candidate Accepted Certification Bodies (ExCBs) and Ex Testing Laboratories (ExTLs) operating in the IECEx Certified Equipment Scheme.
-
5.2.2
US Proposals concerning IEC CAB Policy document CAB-P02:2017 Peer Assessment Fundamentals
-
5.3
US Proposals concerning the Draft IECEx Supplement to the IEC Harmonised Basic Rules Edition 2.0
-
5.3
Draft Supplement to the IEC Harmonised Basic Rules, IEC CA 01 – for consideration by ExMC
-
6.3.1
Report of new ExCBs and ExTLs approved since, or during, the Umhlanga 2016 IECEx Series of Meetings
-
6.4
IECEx Procedures for the Processing of Applications for Extension of Scope from ExCBs and ExTLs
-
6.4
GB Discussion paper concerning the processing of scope extension applications of ExCBs and ExTLs in the IECEx 02 Equipment Scheme
-
6.5
Further Updated proposal from the IECEx Executive concerning certain matters to be delegated to the Executive
-
7.2
Report of IECEx ExCB/ExTL Re-assessment reports for IECEx Schemes 02 and 03 and 04 issued since the last ExMC Meeting, Umhlanga 2016.
-
8.12
US Proposals concerning application of IEC 62784, Vacuum cleaners and dust extractors providing equipment protection level Dc for the collection of combustible dusts – Particular requirements
-
8.5
Draft new Operational Document - Requirements when dealing with the Suspension or Cancellation of IECEx Certificates of Conformity issued under the IECEx 02 Certified Equipment Scheme
-
8.6
Draft Requirements for Additional Testing Facilities – for discussion within ExMC WG1 prior to issuing to ExMC
-
8.6
GB Proposal concerning a change to the ExTR Cover regarding the name and address of the Laboratory.
-
8.8
Working Group WG5 – Quality System requirements of Ex Manufacturers held following the WG1 Meeting in Hawarden, UK
-
9.1, 9.1.4
MEETING REPORT + AGENDA Meeting #10 of the IECEx Mark Committee (ExMarkCo) Held at CSA Group in Hawarden, UK on Thursday 11th May 2017
-
9.1.4
Survey / Questionnaire Results from ExCBs involved in the IECEx Mark Licensing Scheme
-
10.2
2016 ExSFC Meeting #3 Monday 8th May 2017, 1:30 to 5:30 PM CSA Group, Hawarden, UK
-
10.9
Revision of Application Form for acceptance as an IECEx Certification Body in the IECEx Certified Service Facility Scheme(s)
-
11.3
OD 501 – Assessment Procedure for IECEx Acceptance of Certification Bodies, Edition 3.1
-
11.7
Site Assessment Report for Assessment for TRAINOR ELSIKKERHET AS as an Accepted Ex Certification Body (ExCB) for the IECEx 05 Certificate of Personal Competencies Scheme (CoPC)
-
14.2
IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System) Utilization of Customers’ Testing Facilities
-
14.3
Proposed Revised Edition of IECEx Operational Document OD 202 – IECEx Proficiency Testing Program (Ex PTP)