Documents are now Secure. Please use the standard Members password to access the documents. If you experience any difficulty please email the Secretariat.
Agenda Item | Document Number | Title |
---|---|---|
3.1 | ExTAG/664/DL |
Decision List The Twenty Third Meeting of the ExTAG held in webinar format on 31st August and 1st September 2021. |
2 | ExTAG/650A/DA |
The Twenty Third Meeting of the ExTAG To be held remotely – Tuesday 31st August 2021 Wednesday 01st September 2021 |
3.1 | ExTAG/631/DL |
The Twenty Second Meeting of the ExTAG held in webinar format on 29th and 30th September 2020 |
3.1 | ExTAG/647/R |
Report of The Twenty Second Meeting of the ExTAG held remotely - September 29th and September 30th 2020 |
3.2 | ExTAG/651/R |
Status Report on Action Items from the 2020 ExTAG Remote Meeting |
5.1 | ExTAG/633/Inf |
Discussion paper regarding dielectric strength test |
5.1 | ExTAG/633A/Inf |
Discussion paper regarding dielectric strength test |
5.2 | ExTAG/652/Inf |
Discussion Document – Increasing Ambient Temperatures |
5.3 | ExTAG/662/Inf |
Discussion Document – Subcontracting of Tests within the IECEx Certified Equipment Scheme |
7.2 | ExTAG/654/R |
Report from Mr. Ron Webb, ExTAG WG 03 Convenor, Documentation and Drawing Requirements - OD 017 Drawing and documentation Guidance for IEC Ex Certification – for use by Manufacturers and ExTL |
OD 012 |
OD 012ExTAG Guide for Application of Uncertainty of Measurement to conformity for laboratory tests carried out under the IECEx System OD 012 Ed.3.0 |
|
8.2.2, ExTAG 7.3 | ExMC/1735/DV |
Amendment to IECEx OD 012, Edition 2.0 |
7.3 | OD 024 |
OD 024IECEx Rules of Procedure covering testing, or witnessing testing at a manufacturer’s or user’s facility (Ed 4.0) |
7.5 | ExTAG/655/R |
Report from Tim Krause, Convenor ExTAG WG 10, Proficiency Testing |
7.5 | ExTAG/656/CD |
Draft Revision of OD 202 IECEx Proficiency Testing Scheme Ed.3 |
7.5 | OD 207 |
OD 207Guidance on the Retention of Records. (Ed. 2.0) |
7.8 | OD 034 |
OD 034Operational Document - Guidance on the preparation of IECEx Equipment Certificates and Reports covering more than one identifiable item of equipment Ed. 3.0 |
8.1.1 | ExTAG/659/Inf |
ExTAG/659/Inf – Role of IECExTAG Decision Sheets |
8.1.2 | ExTAG/657/Inf |
Draft Decision Sheets withdrawn as well as Decision Sheets Published since 2020 Remote ExTAG Meeting |
8.2.1 | ExTAG/649A/R |
Reconfirmation of Decisions Sheets falling under the 5 year review (2015) |
8.2.2 | DS 2016/001 |
ExTAG Decision Sheet - Enhanced clearance and creepage distances |
8.2.2 | DS 2016/002 |
Application of Failure Analysis such as FMEA in intrinsic safety “i” |
8.3 | EXTAG/658/CD |
Initial Draft for the Revision of IECEx OD 035 – Procedures to generate and maintain IECEx ExTAG Decision Sheets (DS) |
9.1 | ExTAG/635A/CD |
ExTAG/635A/CD Draft ExTAG Decision Sheet - Field modular approach for Ex Equipment |
9.1 | ExTAG/648/CC |
Compilation of comments on - ExTAG/635/CD – Draft ExTAG Decision Sheet - Field modular approach for Ex Equipmen |
9.2 | ExTAG/663/CD |
ExTAG/663/CD Draft ExTAG Decision Sheet – IEC 60079-6 High Voltage Testing |
9.3 | ExTAG/661/CD |
ExTAG/661/CD – Draft ExTAG Decision Sheet – Information relevant to particular protection Ex 60079-46 into the quality management system. |
12 ExTAG, 12.1 ExMC | ExMC/1606/Inf |
Notification of issue of IEC Administrative Circular AC/23/2020 |