Meeting Home
General Information
Meeting Registration
Hotel Reservation
Industry Symposium
 
Sponsors include:

ExTAG Meeting Documents

Last updated 080919

 
Zipfile of meeting documents
(extract all documents before opening agenda - ExTAG/138C/DA)
 

ExTAG Training Workshop Monday 29th September 2008

Agenda Item number Document number Title

 

ExTAG/139/Inf

IECEx ExTAG Training Workshop to be held in Paris,

Monday 29th September 2008

  ExTAG/147/Inf Secretariat’s Review of the On-Line Certificate of Conformity System - Linkage of issued IECEx Certificates of Conformity to Draft ExTRs and Draft QARs.
     

ExTAG Technical Meeting Tuesday 30th September 2008

  ExTAG/138C/DA Draft Agenda the Tenth Meeting of the ExTAG to be held in Paris, France, 30th September 2008

(earlier versions of the Draft Agenda are available on the ExTAG Documents page)

     
3 ExTAG/127A/RM Confirmed Minutes the Ninth Meeting of the ExTAG – Denver USA
10.2.4 ExTAG/130/CD Draft Decision Sheet - Totality of equipment to be suitable for hazardous area installation when issuing IECEx certificates

9.11

ExTAG/132/CD

Equipment for gas and dust explosive atmospheres –

Special protection “s”

10.2.4 ExTAG/133A/CC Compilation of Comments received concerning document: ExTAG/130/CD: –Totality of equipment to be suitable for hazardous area installation when issuing IECEx certificates
9.6 ExTAG/135/CD Draft Ex/OD012/Version 2 - ExTAG Guide for Application of Uncertainty of Measurement to conformity for laboratory tests carried out under the IECEx Scheme
10.2.1 ExTAG/136/CD Revision of ExTAG Decision Sheet DS 2004/006
10.2.2 ExTAG/137/CD Revision of ExTAG Decision Sheet DS 2006/002
4.2 ExTAG/139/Inf IECEx ExTAG Training Workshop to be held in Paris, Monday 29th September 2008
10.3 ExTAG/140/CD Lack of an Authoritative Source for  “Manufacturer’s Documents”
9.2 ExTAG/141/R ExTAG Ad Hoc WG02 Report
Good working practices for IECEx Working Groups
12 ExTAG/142/CD ExTAG Industry Discussion Request – Group 1 Mining
10.2.4 ExTAG/143A/CD Updated version of the Initial response from TC 31 Maintenance Team regarding the IEC Standard IEC62013 Caplights and EXTAG documents ExTAG/130/CD and ExTAG/133/CC
10.1.1 ExTAG/144/Inf  A list of ExTAG Decision Sheets approved since the Denver 2007 Meetings
10.2.2 ExTAG/145A/CD ExTAG Industry Discussion Request – Unspecified Ex Certified
9.12 ExTAG/146/R Report from Dr Uwe Klausmeyer, Convenor ExTAG WG 10, Proficiency Testing
  ExTAG/147/Inf Secretariat’s Review of the On-Line Certificate of Conformity System - Linkage of issued IECEx Certificates of Conformity to Draft ExTRs and Draft QARs.
10.2.3 ExTAG/148/CD ExTAG Draft Decision Sheet Application of clause 7.5.3 for series limiting components for voltage limitation of IEC 60079-11
12.2 ExTAG/149/CD Conformity Assessment of Material’s Physical Properties
9.5 ExTAG/150/R Report from Convenor WG3 – OD017, Drawing and Documentation Guidance for IEC Ex Certification - Activity Report 2008
     
16 ExMC/436/Inf Nomination for consideration as IECEx Chairman “Nomination from the United States of America - Mr Kerry McManama”
 
6.2 ExMC/460/CD  Draft OD 003 Part 2: Procedures for the assessment, surveillance assessment and reassessment of ExCBs and ExTLs (Draft Revision OD 003 Version 1) prepared by Mr Jim Munro, Chairman of Panel of Assessors
18 ExMC/474/Inf ISO and IAF announce schedule for implementation of accredited certification to ISO 9001:2008
9.6 IEC GUIDE 115 Application of uncertainty of measurement to conformity assessment activities in the electrotechnical sector
     
9.5 OD 017/V3 Drawing and Documentation Guidance for IEC Ex Certification and ExTLS
11 OD 019/V4 IECEx Participation and Scheme Fees
9.10 OD 021/V2 Guidance document for the Assessment of I.S systems and equipment
9.2 OD 031/V1 Guide for Good Working Practices for the Management of IECEx Scheme Working Groups.
     
10.1.2 DS 2003/01 IEC 60079-11 Limitation of RF power Status of document: draft
10.1.2 DS 2003/02  ExTAG decisions and recommendations: Proposal for a procedure to generate, discuss and finalise them
10.1.2 DS 2003/003 Assessment of infallible safety shunt assemblies
12.2 DS 2008/002 CTI Testing
12.2 DS 2008/004 Acceptance of test data
     
     
 


Copyright IECEx 2008