Doc. No |
Title |
Meeting
Agenda |
Combined Meeting of the following IECEx
Working Groups Working Group WG1 – Revision of IECEx Scheme Rules
and Procedures Working Group WG5 – Quality System requirements of
Ex manufacturers DRAFT MEETING AGENDA Sunday 10 October 2004 At
Brdo, Slovenia |
ExMC/199/CD |
DRAFT Rev IECEx 02 – Rules and Procedures |
ExMC/196/DC |
Draft Revision of Publication IECEx 01 - IEC
Scheme for Certification to Standards for Electrical Equipment for
Explosive Atmospheres (IECEx Scheme) - Basic Rules |
ExMC/193/R |
Confirmed Report of First Meeting of the ExMC
Working Group WG 10 – IECEx Repair and Overhaul held In SPRING
Building, Singapore 15 and 16 June 2004 |
ExMC/181A/RM |
Confirmed Minutes of the ExMC Budapest MEETING –
9+10 OCTOBER 2003 |
ExMC/161A/CD |
DRAFT: Guidelines on the Management of
Assessment and Surveillance programs for the assessment of
Manufacturer’s Quality System, in accordance with the IECEx
Scheme, Revision of ExMC/161/CD |
ExMC/161/CD |
Guidelines on the Management of Assessment and
Surveillance programs for the assessment of Manufacturer’s Quality
System, in accordance with the IECEx Scheme |
IECEx 02 |
IEC Scheme for Certification to Standards for Electrical Equipment for Explosive Atmospheres (IECEx
Scheme)- Rules of Procedure |
IECEx 01 |
IEC Scheme for Certification to Standards
for Electrical Equipment for Explosive Atmospheres (IECEx
Scheme)- Basic Rules |
Ex/OD009/V1 |
IECEx Operations Manual - Procedures for the
Issuing of IECEx Certificates of Conformity, IECEx Test Reports
and IECEx Quality Assessment Reports |
DE Comments on Rev IECEx 02 |
DE Industry comments and proposed changes to
current IECEx 02 |
Draft OD009/Ver.2 |
IECEx Operations Manual - Procedures for the
Issuing of IECEx Certificates of Conformity, IECEx Test Reports
and IECEx Quality Assessment Reports |
WG5/2004-03 |
Quality Assessment Certificate/Notice |
WG5/2004-02 |
Quality Audit Report |
WG5/2004-01 |
Surveillance Audit Report |
|
|